Majestic Reality

Chino, CA

Majestic Management was looking for some new ideas to create an attractive lobby after a long term tenant moved out.

The Problem:

Majestic Management had a long term tenant (Closet World) that moved out of a property that was in need of remodeling. The property had a lobby that was very dated and needed to be brought up to speed, the décor was eighties and very run down. Majestic Management was looking for new ideas to create an attractive lobby to help bring in a new long term lease.

The budget was not hard set but needed to be in line with capital expenditures. The other issues were current building codes as well as proper lighting, security, and safety with the staircase. There was also an existing fountain that Majestic wanted to eliminate.

Services Rendered
  • Demolition
  • Concrete/CMU
  • Electrical and Lighting
  • Drywall / Plaster
  • Doors / Windows
  • Flooring
  • Glass Handrail System
  • HVAC
  • Paint

Our Approach

A team meeting with the project manager and design team was performed to determine the best, up to date options to get the look and feel of a modern lobby without full demo while leaving the existing stair structure intact to work around.

The fountain was the first thing to be removed to optimize the size of the lobby, There were pumps and pipes for the fountain in the floor and walls that we needed to safe off and also hide any existing plumbing, so a planter was designed with no irrigation just for fake plants.

The T-Bar grid ceiling was out of date and used fluorescent lighting fixtures so opening up the ceiling gave a bigger, more modern feel to the lobby.

Once we removed the T-bar ceiling we had to address the current, out-dated florescent lighting. The idea we came up with was taken from an automobile dealership. The dealership often uses lighting to accent certain area cars, we thought this would have a nice effect on the lobby.

At this point we needed a lighting photometric study done to determine the size of the light fixtures and height of the lights to accomplish the desired lighting effect of the lobby.

The metal stairs were our next issue to work around and update so the idea of a glass railing system was going to be tough with the existing guardrail system that was welded to the structural stair beams. What we determined (with the help of a professional glass company) was to cut all the metal guardrails off and use automotive bondo to smooth out all the areas so the new glass system could be bolted to the existing beams.

Final painting and flooring was then installed with the customer highly involved to get the best fit and finish possible. The ceiling was painted black to basically make it disappear above the new lights.

“Not only did FCS figure out how to deal with the situation, but they got it done in the time frame that I needed. I was happy with the finished product as well as with their flexibility during the project. I am looking forward to working with FCS more in the future. It is nice when a contractor understands your business model as a property manager and wants to help meet your goals.”

Christi Colby

CPM, R.P.A, Majestic Management Company

Final Thoughts

This project was in line with what we offer as a company. Forefront Construction Services specializes in creativity and problem solving. As this project had its hurdles, we overcame them and had fun creating a completely new lobby and office environment. We often like to name our projects as it makes them easier to identify, but also a little fun. This project was nicknamed (for obvious automotive references) The Jaguar!